Infrastructure Tracker

The projects behind every growth thesis

Every record shows its authority, current status, source basis and last verification date. Status changes can now be managed through the admin panel without changing code.

ProjectAuthorityRegions affectedStatusSource / verified
Mumbai Trans Harbour Link (Atal Setu)
Roads & Bridges · Completed 2024
MMRDANavi Mumbai, Third MumbaiOperationalMMRDA official project page
Verified 2026-07-18
Navi Mumbai International Airport
Aviation · Phase 1 targeted 2026–27
CIDCO / NMIALNAINA, Navi Mumbai, KSC New TownUnder constructionCIDCO / NMIAL project updates
Verified 2026-07-18
NAINA arterial road network
Roads & Bridges · Phased, 2025–2029
CIDCONAINATenderedCIDCO tender notifications
Verified 2026-07-15
Sindhudurg Airport connectivity upgrade
Aviation · Targeted 2027
Maharashtra Airport Development CompanySindhudurgTenderedMaharashtra Airport Development Company
Verified 2026-07-17
NH66 widening (Konkan stretch)
Roads & Bridges · Phased completion through 2027
National Highways Authority of IndiaSindhudurg, Dodamarg – Goa BeltUnder constructionNHAI project dashboard
Verified 2026-07-10
Navi Mumbai Metro Line 1
Rail & Metro · Completed 2023
CIDCONavi MumbaiOperationalCIDCO Metro project updates
Verified 2026-07-05
Proposed Third Mumbai industrial & logistics corridor
Industrial · Not yet finalised
Under discussion — no single notified authorityThird MumbaiProposedRegional planning discussion papers
Verified 2026-07-08
Konkan Railway capacity upgrade
Rail & Metro · Targeted 2028
Konkan Railway CorporationSindhudurg, Dodamarg – Goa BeltApprovedKonkan Railway Corporation announcements
Verified 2026-07-02
KSC New Town arterial connectivity
Roads & Bridges · Not yet finalised
CIDCOKSC New TownProposedCIDCO planning discussion documents
Verified 2026-07-01
JNPT (Jawaharlal Nehru Port) capacity expansion
Ports & Logistics · Phased through 2027
Jawaharlal Nehru Port AuthorityNavi Mumbai, NAINAUnder constructionJNPT official announcements
Verified 2026-07-12

Mumbai Trans Harbour Link (Atal Setu)

Operational

Primary access corridor unlocking the Third Mumbai growth thesis and shortening Navi Mumbai's commute to South Mumbai.

Limitations: Toll costs and approach-road congestion at peak hours.

MMRDA official project page2026-07-18

Navi Mumbai International Airport

Under construction

Core catalyst for the entire NAINA growth thesis and a secondary driver for Navi Mumbai and KSC New Town.

Limitations: Construction timeline has slipped multiple times historically.

CIDCO / NMIAL project updates2026-07-18

NAINA arterial road network

Tendered

Determines which NAINA sectors become development-ready first — sector selection should track this closely.

Limitations: Sector-by-sector rollout means uneven progress across NAINA.

CIDCO tender notifications2026-07-15

Sindhudurg Airport connectivity upgrade

Tendered

Expanding scheduled flight connectivity is the single biggest lever for Sindhudurg's tourism-linked growth thesis.

Limitations: Scheduled flight frequency remains limited in the interim.

Maharashtra Airport Development Company2026-07-17

NH66 widening (Konkan stretch)

Under construction

Reduces travel time along the entire Konkan coast, supporting both the Sindhudurg and Dodamarg–Goa theses.

Limitations: Construction-phase disruption to existing travel times.

NHAI project dashboard2026-07-10

Navi Mumbai Metro Line 1

Operational

Improves intra-city connectivity within established Navi Mumbai nodes; a maturity signal, not a new catalyst.

Limitations: Limited route coverage relative to the full metro master plan.

CIDCO Metro project updates2026-07-05

Proposed Third Mumbai industrial & logistics corridor

Proposed

The central pillar of the Third Mumbai thesis — but remains at the proposal stage with no consolidated master plan.

Limitations: No approved master plan or notified authority as of this review.

Regional planning discussion papers2026-07-08

Konkan Railway capacity upgrade

Approved

Increased rail capacity would materially improve access to the coastal corridor for both tourism and residential demand.

Limitations: Approval secured, but tendering has not yet begun.

Konkan Railway Corporation announcements2026-07-02

KSC New Town arterial connectivity

Proposed

Would be the first concrete infrastructure commitment in KSC New Town beyond the planning notification itself.

Limitations: Remains at proposal stage — the earliest-stage project we track.

CIDCO planning discussion documents2026-07-01

JNPT (Jawaharlal Nehru Port) capacity expansion

Under construction

Supports continued logistics and warehousing demand across Navi Mumbai and NAINA's industrial nodes.

Limitations: Primarily benefits industrial/logistics land, not residential.

JNPT official announcements2026-07-12